HYDROPOWER PLANT MAGLIO IN LONATO DEL GARDA
Buyer:
Consorzio del fiume Chiese;
Turbine installation:
Angled axis tubed Kaplan;
Generator installation:
Synchronous three-phase motor 400V 300 kW;
What we did:
Delivery and installation of the electric components for the hydropower set in the Maglio Plant, in Lonato del Garda (BS) in partnership with EXMONT WATER TURBINES (Brno – Czech Republic).