HYDROPOWER PLANT IN PREVALLE CHIESE
Buyer:
A2A spa
Turbine installation:
Axis Kaplan
Generator installation:
Synchronous three-phase motor 3.2kV 3150 kVA
What we did:
Remaking of the hydropower plant in Prevalle on the River Chiese (BS), in partnership with ANDRITZ. Installation of a new middle/low tension system, automation system and telecontrol.