HYDROPOWER PLANT IN BOVEGNO
Buyer:
EFITECH srl
Turbine installation:
Vertical axis Kaplan
Generator installation:
Synchronous three-phase motor 400 V 350 kW
Gross distance gap:
12.5 m
What we did:
Authorisation, design and installation of the hydropower plant on the river Mella in Bovegno (BS). Realised in partnership with TSCHURTSCHENTHALER, the existing power plant with 100 kW Francis wheel was widened and equipped with brand new pipes and a new basement power station. Eltech was responsible for authorisation, design and realisation of electric devices.