HIGH VOLTAGE STATION IN LURA
Buyer:
Erdat Lura SH.P.H
What we did:
Design and realisation of two high voltage station to connect three hydropower plants for a total power of 25 MVA. A first small station is collocated in Kurbnesh and was the implementation of an existing one, to supply a new 22km long line, ending in Lura, where the three main plants are situated. In Lura, a new high voltage pillar with a transformer of 25 MVA was installed. The automation and SCADA control system for both stations was also designed and realised by Eltech.