ADJUSTMENTS HYDROELECTRIC PLANT SWISSPOWER OF PIETRAPORZIO (CN)
Have recently concluded the adaptation work done by Eltech team at the central of Pietraporzio (CN), the Swisspower properties.
The work mainly involved the adaptation of the medium voltage part: transformer compartments MT, interface protection system. It was also adjusted the central software according to the changes made to the system.