LURA 1-2-3 HYDROPOWER PLANTS
Buyer:
Sedamyl – Biberi
Groups Installed:
Group 1: Horizontal axis Pelton turbine with 2 jets
P: 3.269 kW
Group 2: Horizontal axis Pelton turbine with 2 jets
P: 3.269 kW
Group 3: Horizontal axis Pelton turbine with 2 jets
P: 2.012 kW
Group 4: Horizontal axis Pelton turbine with 2 jets
P: 2.012 kW
Gruppo 5: Vertical Pelton turbine with 6 jets
P: 1.827 kW
Gruppo 6: Horizontal Francis turbine
P: 3.817 kW
Work Description:
Supply and installation of:
- High voltage station 110 kV
- HV/MV Transformator
- Eltectic MV plants 20 kV
- Transformators MV/LV
- Automation of all generator groups